Validation Services

Validation-Ready Automation, From FAT to Year 10

The engineers who build your equipment qualify it and keep it compliant for its whole life.

Requirements traceabilityExample
Illustrative example of a requirements traceability matrix that links each requirement to a qualification test and its result.
RequirementTestResult
URS-014Fill volume within toleranceOQ-031Pass
URS-022Reject units with a missing labelOQ-047Pass
URS-031Audit trail on recipe changesOQ-052Pass
URS-040Sustained output at rated speedPQ-004Pass
Illustrative example. Every requirement traces to a test and a reported result.

Validation starts at the first quote.

Validation is required for every pharma and medical device line, and it is often where startups get delayed. R+D Automation builds validation into the project from day one, then keeps your equipment compliant long after installation. Whether we built the machine or not, our team can help.

For new projects

Validation Packages

Add a complete validation package to any automation project.

  • IQ / OQ / PQ protocol development, execution and reports
  • FAT / SAT documented testing at our facility and yours
  • Validation-ready engineering, quality and automation documentation built to GAMP 5
  • Requirements traceability from URS to test

New · For equipment in production

Validation-as-a-Service (VaaS)

Validation does not end at startup. VaaS gives you an annual block of validation support, budgeted once at the start of the year.

  • Change impact assessments
  • Requalification support
  • Document reviews
  • Audit preparation
  • Remote consultation

What happens to validation after startup?

Your validated state changes every time your equipment does.

01

PLC & Software Upgrades

02

New Products

03

Recipe Changes

04

Equipment Modifications

05

Aging Components & Obsolescence

VaaS keeps every change documented, assessed and audit-ready.

Why Validate With the Team That Built It

We Know the Machine

The engineers who designed it write and run the protocols.

Fewer Handoffs

No third party learning your equipment from scratch.

Faster Startup

Validation is planned during design, not after delivery.

Proven Quality Systems

ISO 9001 certified, GAMP 5 aligned, UL 508 compliant.

One Partner, Every Stage

1

Plan

Define validation scope and strategy during quoting.

2

Build

Documentation created alongside the machine.

3

Qualify

FAT, SAT, IQ, OQ and PQ executed and reported.

4

Support

Ongoing compliance through Validation-as-a-Service.

Validation support for the full life of your equipment.

Year 0FAT, SAT, IQ, OQ
Year 1PQ, ramp-up
Year 2+Requalification, change control
ExpansionNew lines, retrofits

Frequently Asked Questions

Can you validate equipment R+D didn't build?

Yes. Our validation team supports equipment from any manufacturer, including legacy systems already in production.

Yes. We provide PQ protocol development, execution support and final reporting.

Yes. Ask your account manager, or request a quote and note that you need validation.

Our documentation follows GAMP 5 and is built to support FDA and GMP requirements. R+D is ISO 9001 certified.

VaaS is offered as annual plans based on support days. Contact us and we will recommend the right fit.

Get Validation Support

Tell us about your project. We’ll respond within one business day.

    How Did You Hear About Us

    Your Name (required)

    Your Company (required)

    Your Email (required)

    Your Phone (required)

    Your Subject (required)

    Your Message

    Upload Your File (or image)

    Planning a Project or Need Support on Equipment Already Running?

    Let’s talk about keeping your equipment validated from day one.